Products
Ground Screw
  • Ground ScrewGround Screw
  • Ground ScrewGround Screw
  • Ground ScrewGround Screw

Ground Screw

For ground-mounted solar projects, Baiyili supplies Ground Screw foundations as a China manufacturer and supplier, with configurable steel shaft diameters, pile lengths, helical blade sizes and top connections. The screw-in design can reduce concrete work and simplify installation where soil conditions and structural requirements are suitable.

Ground-mounted photovoltaic systems need foundation components that suit the site soil, structural loads and mounting design. Baiyili, a professional manufacturer from China, supplies Ground Screw solutions for solar ground mounts, PV carports, fences and other outdoor structures, with dimensions and connection options selected for each project.

Installation works by rotating the helical steel pile into the ground, so the pile transfers structural loads into the surrounding soil. Anchor bolts and compatible mounting accessories complete the connection to the supported structure. Solar Roof Hook is a separate accessory for roof-mounted PV and is not normally part of a ground foundation assembly.

Helical pile for solar ground mountsGalvanized steel shaft and helical bladeTop connection options for ground anchors

Technical Parameters

The table below lists supplied reference specifications. Final selection should follow the product drawing and project design.

Item Specification
Product Name Ground Screw
Product Type Helical ground screw / solar ground anchor
Main Material Q235B / Q355B carbon steel
Surface Treatment Hot-dip galvanized
Reference Zinc Coating Thickness ≥85 μm, according to the supplied specification
Pipe Diameter 76 mm / 89 mm / 114 mm / 140 mm, customizable
Pipe Wall Thickness 2.0 mm / 2.5 mm / 3.0 mm / 3.5 mm / 4.0 mm
Pile Length 1,000–3,000 mm, customizable
Helical Blade Diameter 200–500 mm
Blade Quantity 1, 2 or 3 blades, depending on the design
Top Connection Flange plate, U-shaped connector or square head
Reference Uplift Capacity 5–30 kN, depending on soil conditions, pile geometry and installation
Wind-Load Design Project-specific; requires verification of the foundation, mounting structure, soil and site wind conditions
Reference Service Life 25–30 years as supplied; actual durability depends on corrosion exposure, coating condition, installation and maintenance
Typical Applications Ground-mounted PV, solar carports, fences and other suitable outdoor structures
Soil Compatibility Determined by site investigation and installation assessment

Load-capacity note: The stated uplift range is a reference, not a universal rating. Allowable capacity must be established for the selected pile and site conditions. Wind speed alone does not determine the capacity of the complete foundation system.

Core Features

Screw-In Installation

A Ground Screw is installed by rotating the pile into suitable soil with compatible installation equipment. This can reduce excavation and concrete-pouring work compared with conventional concrete foundations, depending on ground conditions and foundation design.

Configurable Dimensions and Connections

Shaft diameter, wall thickness, pile length, helical blade dimensions and top connection can be selected to match the proposed structure and site conditions.

Mechanical Load Transfer

The shaft and helical blades transfer loads from the supported structure into the surrounding soil. Compression, uplift and lateral resistance depend on soil properties, pile geometry, embedment depth and installation quality.

Corrosion Protection

Hot-dip galvanizing provides a protective zinc coating for the steel components. Long-term performance depends on coating thickness, soil chemistry, moisture, exposure conditions and the treatment of damaged areas.

Potential for Removal and Reuse

Where the installation method and soil conditions permit, a Ground Screw may be unscrewed and recovered when a project is dismantled. Reuse requires inspection of the shaft, blades, welds and coating.

Adaptation to Different Project Layouts

Ground Screw configurations can be considered for ground-mounted PV, solar carports, fences and other structures with compatible loading and connection requirements. Site suitability must be established before installation.

Structure and Compatible Accessories

Component Function
Steel Shaft Forms the main body of the pile and transfers structural loads into the ground.
Helical Blade Engages with the surrounding soil during installation and contributes to axial and lateral resistance.
Top Flange or Connection Plate Provides an interface for connecting the pile to the supported mounting structure.
U-Shaped Connector or Square Head Alternative connection forms for compatible mounting designs.

Related Mounting Accessories

  • Anchor Bolt: Used for specified mechanical connections between compatible foundation and mounting components.
  • Stainless Steel Solar Accessories: May include bolts, nuts, washers and connectors selected for the relevant joint and environmental conditions.
  • Aluminum Solar Rail: Used in compatible PV mounting structures to support and position solar modules.
  • Solar Roof Hook: Intended for suitable roof-mounted solar installations. Its function and fixing method differ from those of a ground foundation.

Accessory compatibility depends on connection geometry, dimensions, load requirements and mounting design. These items should not be assumed to be universally interchangeable.

Materials and Surface Treatment

Main Materials

Component Material or Treatment Selection Notes
Pile shaft and blades Q235B or Q355B carbon steel Material grade and section dimensions should match the specified design.
Corrosion protection Hot-dip galvanizing Coating thickness and coverage should meet the applicable specification.
Top flange or connection plate Steel, according to the selected model Connection dimensions and weld details should match the mounting structure.
Fasteners and related accessories SUS304 stainless steel or other specified grades Select materials according to joint requirements and environmental exposure.

Manufacturing and Quality Checks

Ground Screw fabrication and inspection should address the following areas:

  • Steel shaft and helical blade fabrication: Check dimensions, blade geometry and alignment against the product drawings.
  • Welding and top connection: Inspect welds, flange dimensions and connection features relevant to structural performance.
  • Hot-dip galvanizing: Check coating coverage and thickness against the specified requirements.
  • Dimensional inspection: Verify shaft diameter, wall thickness, pile length and top connection dimensions.
  • Finished-product inspection: Check for visible damage, deformation and coating defects before packaging.

Salt-spray performance, load capacity and other test results should be supported by the corresponding product specifications and test records.

Selection Guide

1. Ground-Mounted Solar Projects

Start with the mounting layout, module arrangement, support spacing and design loads. Select pile diameter, length, blade geometry and top connection based on required load transfer and the site assessment.

2. Solar Carports

Review the carport's column loads, overturning forces, wind exposure and foundation connection details. Pile dimensions and spacing should follow the structural design rather than the supported panel area alone.

3. Sandy or Soft Soil

Do not select a longer pile solely from a generic soil category. Soil density, groundwater, installation torque, blade dimensions and project loads all affect foundation performance. Site investigation or field testing may be necessary.

4. Coastal or Corrosive Environments

Check soil and environmental exposure when specifying the galvanizing system and fastener materials. For severe salt or corrosive conditions, assess coating requirements, material compatibility and the inspection and maintenance plan.

5. Sloped, Frozen or Difficult Ground

Evaluate the slope, soil profile, installation access and seasonal conditions before selecting the foundation. Frozen ground, rock, very loose soil and high groundwater may require specialized installation methods or another foundation solution.

6. Projects with Defined Wind Loads

Provide the site location, structural drawings, support spacing, soil information and applicable wind-design requirements. Verify the complete load path from the PV modules and mounting rails through the pile into the soil.

Installation Precautions

  • Conduct a Site Assessment: Check soil conditions, groundwater, buried utilities, access routes and required foundation loads before installation.
  • Select the Correct Pile: Confirm diameter, wall thickness, length, blade configuration and top connection against the approved drawings.
  • Use Suitable Installation Equipment: Use compatible rotary installation machinery and monitor pile alignment and installation behavior.
  • Follow Alignment Requirements: Maintain pile position and verticality within the tolerances specified in the project design.
  • Inspect Connections: Verify the top flange, fasteners and mounting interfaces, using the specified fastening method and tightening torque.
  • Protect the Galvanized Coating: Avoid unnecessary impact or abrasion during installation. Inspect coating damage and repair it using an appropriate specified system.
  • Evaluate Unfavorable Ground Conditions: Saturated soil, very loose ground, rock or frozen soil may affect installation and foundation performance. Review the method before proceeding.
  • Follow the Approved Layout: Do not change pile spacing, embedment depth or connection details without engineering review.

Common Installation Mistakes and Correct Practices

Common Mistake Correct Practice
Choosing a short pile without checking soil conditions Use site investigation and the structural design to determine the required pile geometry and embedment.
Installing with unsuitable equipment or poor alignment Use compatible rotary equipment and maintain the specified installation tolerance.
Selecting fasteners without checking material and connection requirements Match the fastener grade, dimensions and tightening requirements to the joint specification.
Increasing pile spacing without approval Follow the approved foundation layout and obtain engineering review before making changes.
Using an incompatible top connection Check flange, connector and mounting-interface dimensions before installation.
Ignoring damage to the galvanized coating Inspect damaged areas and apply an appropriate repair method according to the coating specification.
Installing without considering groundwater or difficult soil Assess ground conditions and adapt the installation method or foundation design where necessary.

Delivery and Packaging

Packaging

  • Ground Screw: Bundled with steel straps. The reference bundle weight is approximately 500–1,000 kg, depending on pile dimensions and shipment requirements.
  • Small Accessories: Anchor bolts, connectors and related accessories can be packed in cartons with protective materials and palletized where appropriate.
  • Loading Protection: Use suitable separators or protective padding to reduce abrasion and impact damage to galvanized surfaces during handling.
  • Product Identification: Label bundles and packages with the model, dimensions, quantity and batch information to support receiving and site sorting.

Shipping and Lead Time

Sea freight, land transportation and container shipment can be arranged according to order size and destination. Express shipment may suit small samples, depending on package dimensions and carrier requirements.

Reference lead times are 7–15 working days for standard Ground Screw models and 15–30 working days for customized piles or accessories. Confirm the current production schedule, order quantity and shipping arrangements before placing the order.

FAQ

1. Can it replace concrete foundations for solar projects?

It can be an alternative for suitable ground-mounted applications, but not for every site. Soil conditions, structural loads, installation feasibility and required foundation capacity must be assessed.

2. Are Anchor Bolts and Solar Roof Hooks compatible with every pile?

No. Compatibility depends on connection dimensions and mounting design. Solar Roof Hook is generally used for roof-mounted PV, while this product provides a foundation for ground-mounted structures.

3. How long can a galvanized pile last in coastal conditions?

Service life depends on coating thickness, soil and salt exposure, moisture and maintenance. A long-term service-life claim should be supported by the specified coating and an environmental assessment.

4. Can it be removed and reused?

Often, it can be unscrewed using suitable equipment. Reuse depends on whether the pile, welds, blades and corrosion protection remain in acceptable condition after removal.

5. How should pile length be selected for different soils?

Length should be determined from site investigation, required embedment, structural loads and installation conditions. Soil type alone is not sufficient to assign a universal pile length.

6. Does the pile need to be installed together with Solar Roof Hook?

Normally, no. The pile is used for suitable ground foundations, while Solar Roof Hook is used for suitable roof-mounted PV systems.

7. What information is needed for a quotation?

Provide the required pile length, diameter, wall thickness, blade size and quantity, top connection, soil conditions, structural loads, coating requirements and delivery destination. Drawings or site information help determine a suitable pile configuration.

Send Inquiry
Contact Info
Send Baiyili your drawings, site conditions, load requirements and material specifications to discuss PV mounting systems and custom steel components.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
RejectAccept